
EL VARON Project
EL Varon project consists of "Tati" and "San Marino No.2" mining concessions.
The laboratory analysis shows rich poly-metallic mineral deposits rich in Gold, Silver, Copper, and Zinc metals.
Existing Infrastructure
El Varon already has the necessary infrastructure for mining operations, including electricity, proximity to water and accessible transportation.
Production Capabilities
The planned monthly output for early 2008 is 4,000 tonnes / month. The production is expected to grow to 6,000 tonnes / month by the end of 2008.
The laboratory analysis shows rich poly-metallic mineral deposits rich in Gold, Silver, Copper, and Zinc metals.
Growing Opportunities
In the last five years, the value of Peru's mineral production has grown by nearly 25 per cent.
The gold production increased by 20%, and gold exports generated more than $4 billion in revenue.